Back to

Troubleshooting

How can I change values that don’t fit in the first view (MM02)

When you use the MM02 Material Master Transaction to change the forecast for products, MM02 does not show you all 12 forecast periods in one screen. In this case, use this workaround to change the values that don't fit in the first view:

Change the values for the periods that appear in the first view. For example, suppose up to seven rows are shown in the initial view. Map the values for the entries: FieldName(01) to FieldName(07), and then click Next Page (this would be BDC_OKCode of "=P+") to show the second view of that screen.

On the second view, the next five rows (8 through 12) correspond to these mapped entries: FieldName(01) (this being entry 8) through FieldName(05) (this being entry 12).

Change the desired entry.

Also in this section

While attempting to run, I get "Protocol error when communicating with SAP GUI"

Everything looks right in my script. Why won’t it upload?

The add-in for Excel is not appearing

Why can’t I validate the data? The Validate button is not appearing.

Why can’t I see the usual screens in my SAP transaction?

Can I toggle between batch and non-batch modes while running a script?

Why can’t I open SAP? My logon screen is blank, without any systems listed.

How do I handle fields that do or do not appear on the screen?

How can I select an SAP view?