Assets
An asset can be modified by more than one project at a time. Changes to an asset can also take
place outside the scope of a managed project within EngageOne™ Designer. For example, the
same asset can be branched in multiple projects at any given time within EngageOne™ Designer.
When assets are assigned to a project, the project asset becomes a branched version of the
original in EngageOne™ Designer. For the life of the managed project, assets will be
unaffected by any changes made to the original or by any other branches of the original. Note
that this includes changes applied to the asset by other projects. The project asset is therefore
isolated and only contains the modifications that apply to the project. When all assets have been
approved, the changes are merged back into the Main project in EngageOne™ Designer, taking
into account any changes made by other projects. Any newly created asset will not appear on the
EngageOne™ Designerner Main project until the merge has
taken place.
Note: Changes to assets across different projects must be managed consistently in EngageOne™ Designer to ensure that expected updates are applied to your asset.