You are here: Reference Guides > Workflow Nodes (A-Z) > Start Node

Start node properties (Designer)

The Start node is used as a visual reference in a workflow to indicate where it begins. A Start node is required to initiate a process.

Property

Description

Assignment CompletionLinkText

A hypertext link directing the assignee to their task. This usually does not apply to the Start node.

Description

A description of the task/assignment. This usually does not apply to the Start node.

ItemLevelPermissions

The name of the SharePoint permission set that should be ascribed to the Originator for the SharePoint item against which the workflow will run.

ItemLevelPermissionsType

Can be one of the following:

  • None — does nothing with respect to permissions.
  • Add — adds the given permission to the item.
  • Replace — replaces the current permission sets with the given permission set.

ItemLinkText

A hypertext link directing the assignee to the form or document pertaining to the task. This usually does not apply to the Start node.

MainPageLinkText

A hypertext link directing the assignee to the Winshuttle Workflow site where the task originated. This usually does not apply to the Start node.

Name

The name of the task/assignment. This usually does not apply to the Start node.

SetValues

Allows you to set a value in a form field or SharePoint list item, after the task has been completed.

Type

Read-only type of the node.